When designing the artesian wells and facilities for the withdrawal of groundwater addressed key issues as:
-selection of the site for well placing; -selection of the water-bearing horizon for continuous exploitation; -definition of possible flow-rate of a single well, the definition of the required number of working and backup wells, as well as the distance between them; -calculation of interaction between all the wells; -selection of the type of filter for the well and defining its main dimensions; -selection of the water-lifting equipment for the continuous exploitation; -selection of the drilling method and of type of the drilling machines; -development of the construction of well head wall. -hydro-geological studies and calculations; -calculation of water intake productivity and reduction of dynamic water levels, both in the water and in the zone of influence over the design of its exploitation; -selection of the type, schema, and the construction of water pumping equipment and connective communications; - groundwater quality prognosis and drafting sanitary security zones, and if necessary also elaboration of special events for the protection of groundwater against pollution municipal, industrial and other sewage; -evaluation of water influence to the nearby existing water intakes, environment, flora and fauna.
|